P1 calling Terrans for origins recognition! Attention for calls in PVSE/SdE!!
Field evaluations continue.
Resumption of daily forces authorized.
Hormonal healings in progress.
Special distributions increasing!
Tunnels keep dropping.
Terrans prepared for Jump.
*ATP+++Eleven: Projection at 81% (not countdown).
*ATP+++Eleven: Reverberation at 81% (not countdown).
Purification Island (in the Glossary search for NEW ISLANDS): Projectors pointed and in support >>>> 100% (not countdown).
Dreams Island (in Glossary search for NEW ISLANDS) being mapped. Projectors pointed and in support. >>> 100% (not countdown).
Integration Island (in Glossary search for NEW ISLANDS) being mapped. Projectors pointed and in support. >>> 100% (not countdown).
Violators are pushed back.
Crystal Fleet begins Phase 1 / (Han) Download >>>>> 100% (not countdown).
Temporary, end of transmission.
Pleiades 1 (POTENTIALIZING CHAMBERS+++++++).
No comments:
Post a Comment