P1 calling Terrans for origins recognition! Attention for calls in PVSE/SdE!!
Waters Era arrive assured.
New Human Samples are spreading by System.
Attention *HDF! SPECIAL Projector support started: 22% (not countdown).
Physical adjustments continue as Gaia gets up.
Past unify for healing.
The 5th layer opening! "Sinus Virus" active! 84% (not countdwn). Next >>>> The 4th layer opening.
Base 23T, Sector 6/9 depopulated: 9% (not countdown). Zetas invited to leave. The Light Celebrates! Next >>>> 7/9.
Reentry authorizations - - +: denied.
Attention Héreluz! Projector update in progress: 96% (not countdown).
Those who were gone return renewed.
Stacking continues as Projectors are pointed for deployments. (55)
Special openings for inner environments in Sustainability and Safety: Conclusion >>> 66% (not countdown). Next >>> Finishing.
P1 in Data Collection. Next >>>> Analysis.
S.E.N.S.E: INTENSE REVERBERATION STARTED. First Movement: 98% (not countdown).
Temporarily, end of transmission.
Pleiades 1 (BOOSTING NEW PVSE DEGREE).
Translated:C.P.Jorge
No comments:
Post a Comment