Pages

A QUICK NOTE #1144 ABOUT THE SITUATION VIA GABRIEL RL - 24.11.2019

P1 calling Terrans for origins recognition! Attention for calls in PVSE/SdE!!
Restarts are boosted. 
Inner calls occur for self-views.
Neva increases field.
Midunus: called to unvisualize informants in logistics -
Myasmic pilled are dismantled. 
Lunar 9 Projector: Anchorage started! 86% (not countdown).
CONSECRATIONS sent to all Terrans Pillar-supporting!
Myasmic plasma layers being removed (2 and 3 NOR – T) - first movement: 99% (not countdown) Possible side effects.
OPStardust2 prepared. “Contamination” started… 80% (not countdown).
Specific codes being delivered. First Reception >>> 79% (not countdown).
Pro-Love on the surface at 90% (not countdown).
New Islands: Synchronization started! 69% (not countdown).
Temporarily, end of transmission.
Pleiades 1 (SUPPORTING NEVA GRID FORMATION).
Translated:C.P.Jorge

No comments:

Post a Comment